A major vertically-integrated company
Project timeline
February 2023 – November 2024
Team headcount
30+ persons
Technologies
- C#
- ReactJS
- Consta Kit UI
- Postgres
- Hasura
Background
- The need for import phase-out for the software
- Low productivity of the subsystems of the cost engineering system was causing higher speed of assessing the construction and engineering costing for oil and gas fields
Results
- The systems functionality was transferred to modern import-independent stack
- Errors in historic functionality of the IT systems were corrected
- Re-engineering of databases was performed switching from non-relational to relational ones
- New systems functions were implemented including the function of editing reference tables without participation of the software developers
- OPEX planning process was improved at the stages Evaluate and Select for major projects and projects implemented at the operating assets by way of developing and implementing the assessment tools for OPEX associated with oil and gas fields development and operation
- The accuracy and the speed of assessing OPEX associated with optimization planning for re-engineering projects were improved due to creating the OPEX assessment automated system
- Assuring intellectual property and commercial secret protection in the OPEX assessment sphere, as well as quick and accurate CAPEX assessment for different options of oil and gas fields infrastructure
-
172
Implemented functionality requirements to the costing re-engineering system
-
859 > 340
The number of reference tables decreased due to their structure optimization and centralization
Effects for business
- Correct and quick assessment of construction and engineering costing
- Increased speed and volume of the transactions due to