The largest power engineering company
Project timeline
12 October 2023 – 13 May 2024
Team
10 persons
Technologies
- IBM Maximo for Nuclear Power
- vis.js
- jQuery.Gantt
Goals
- Provide NPP personnel with tools for:
- Graphical representation of the composition of maintenance locations and equipment items (and links between them) included in the measuring channel/measuring system
- Visualization of timeframes in work planning: post-repair and pre-repair testing, testing of SCS*, diagnostics of MOVs**, vibration diagnostics, testing of safeguards and interlocks, performing switching operations, technical inspection, calibration, verification, certification of standards, certification of test equipment and maintenance
Objectives
- Development and coordination of design and technical solutions, functionality, user guides and functional admin manuals
- Establishing a test program and methodology
- Conducting acceptance tests, training for key users
- Handover of the developed functionality to commercial operation
-
6
Number of companies that have implemented the change: headquarters and 5 NPPs
-
4,500+
users of the system
-
8
Number of business processes visualized in various aspects for planning purposes
Results
- Test programs and methods, user guides and admin manuals were developed. Training for key users was conducted
- After acceptance testing, the functionality has been put into operation
- A common space for work planning was created, with the possibility of operative adjustment of the terms of the works being carried out
- Visualization of shift planning of operational personnel was implemented in terms of: shift composition, employees in shifts on the time axis by days, employee movements between shifts with a functionality to generate an order and to display its current status, and also with a functionality to switch to the order card from the application under development